Emerson C1300 Instalacion, Cuidados Y Uso página 3

Ocultar thumbs Ver también para C1300:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

OVERVIEW OF A
COMPLETED SETUP
START HERE
1
PREPARATION
A
Required minimum from
center of hole to wall
C1300 .............. 4
H778 ................ 2"
Note: Hole size requirement is 1
The wall outlet for your dispenser must have power
supplied to it continuously and must be fused.
It should not be controlled by the same wall switch
that operates your disposer.
B
If you have to drill through sink or
countertop, you may need to rent or purchase
the appropriate tools.
This appliance must be grounded. This instant hot water dispenser is equipped with a cord that has
a grounding conductor and a grounding pin. The plug must be connected to an appropriate outlet that
is properly installed and grounded in accordance with all local codes and ordinances.
Do not modify the plug provided with the appliance.
PROPER INSTALLATION SHOULD TAKE ABOUT 2-4 HOURS
3
"
8
1
1
" – 1
"
4
2
Electric Shock Hazard: Using an ungrounded or improperly connected
appliance can result in serious injury or death from electrical shock.
I I
Identify locations for the dispenser
faucet, tank and filter (if applicable).
I I
Check to make sure there is proper
clearance (see chart at left) for
dispenser handle to be fully opened.
I I
Check to make sure counter is 3"
thick or less.
I I
Make sure there is a grounded
electrical outlet within 30" of the tank.
I I
Turn off water supply.
I I
If using the sink sprayer hose hole,
remove nut that connects sprayer
hose at bottom of faucet.
I I
Using adjustable wrench, remove nut
connecting sprayer washer flange in
sprayer hole.
I I
Plug hose opening with either a 1/8"
plug or a 1/4" cap (not supplied).
For Technical Assistance
For Technical Assistance
1-800-845-8345
1-800-845-8345
3

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

H778

Tabla de contenido