4. Commissioning
4.1 Presetting
4.2 Use as heating circuit pump
Function
Configuration
PWM output P1
Function
Heating circuit 1
Pump speed min
Pump speed max
Heating circuit 2
Pump speed min
Pump speed max
Heating circuit 3
Pump speed min
Pump speed max
7303554-03 08.12
The control units in gas condensing boilers in the Paramount three 60-115 E series
are preset not to actuate a modulating pump.
Settings if used as a heating circuit pump
If the pump HEP is used as a heating circuit pump, under prog. no. 6085, make the
setting shown in the following table.
Prog. no.
6085
1) Alternative setting if heating circuit 2 is to be supplied
2) Alternative setting if heating circuit 3 is to be supplied
Set the minimum and maximum pump speeds in accordance with the system con-
figuration under menu item Heating circuit 1-heating circuit 3
Prog. no.
882
883
1182
1183
1482
1483
Variable speed pump HEP 25-180-10
Commissioning
Setting level
Setting
Heating circuit pump HC1 Q2
or
Heating circuit pump HC2
1)
E
Q6
or
Heating circuit pump HC3
2)
Q20
Setting level
Setting
E
E
E
E
E
E
GB
25