Descargar Imprimir esta página

Kangui SURF Manual De Instalación / Uso página 5

Ocultar thumbs Ver también para SURF:

Publicidad

Idiomas disponibles

Idiomas disponibles

4 – Connect the pump nozzle into
the valve. The specific nozzle
fits with a ¼ turn into the valve.
6 – Turn the board.
7 – Slide fin base all the way from front to back of the fin box.
8 – Insert fin retention pin through slot. Fin is installed.
9 – Check fin is securely fixed.
!
If Paddle is stored in direct sunlight,
lower the pressure deflating it slightly.
4) DEFLATION – STORAGE
1 – Place the board on a clean and smooth surface and return it. After each sea trip, desalt sup by
rinsing with clear water.
2 – Remove the fin.
3 – Unscrew the valve cap.
4 – Slowly press down the central valve pin.
5 – Turn it clockwise to lock it into the open position.
!
Do not put your face above the valve while deflating.
Pressure is high and can damage your eyes. Sand and other debris can also be projected.
6 – When air is removed, clean the board with a towel or a soft cloth. Make sure that the board is
completely dry before putting it away to prevent mould and bad odours.
7 – Roll it up from the opposite end of the valve (so remaining air can escape from the valve). Once
arrived at the valve, replace the cape on it.
8 – Keep your board totally dry in a clean and dry place.
5) REPAIR
Your SUP KANGUI is made with a High Density PVC. Depending on the use, it can tear. A repair kit with
a tube of glue and 2 PVC pieces (patch) are enclosed.
!
Tears or holes detected on sealing strips are not reparable by the kit delivered.
How to repair :
1 – SUP must be deflated and laid flat.
2 – The identified area to repair must be clean and dry.
3 – Sand slightly around area to repair, it allows glue to stick optimally.
4 – Apply glue on the PVC piece and on the area to repair.
5 – Let dry a few moments (3-4 minutes).
6 – Affix the patch. Press strongly from the centre outward to remove any air bubbles. Smooth the whole
with a round object (spoon).
7 – Put a heavy object on the repairing during 24 hours.
8 – After 24 hours, check the repairing, remove any glue drips.
9 – Inflate your board and check the sailing of your repairing before any navigation.
!
Avoid glue contact with the skin or the eyes. Keep glue away from the reach of children
Perform all of your repairs in a dry, temperate and well ventilated area.
100%
5 – Pump the board. Recommended
pressure to obtain a maximum
rigitdity is 14 PSI/ 1 Bar.
1 bar
14 PSI
5

Publicidad

loading