INSTRUCTION FOR ASSEMBLING
Side Fin Installation (only for Super Trip)
Before inflation, insert two side fins first
A
B
1. Release the valve cover by twisting counter-clockwise. Ensure the valve is
clear from debris, sand, or dirt before releasing.
2. Push valve button in and turn counter-clockwise 90 degrees so it pops up
and is in the "OUT" position.
3. Insert the pump hose and twist it 45 degree clockwise to lock in place.
Inflate until you reach the required pressure.
12PSI minimum (8PSI for MEGA) for proper
inflatable boards operation and 15PSI maximum
(18PSI for RAPID and RACE). Over inflation will
void your warranty.
AND DISASSEMBLING
Pump Set Up And Inflation
Connect the pump hose to the
gauge housing and secure it tightly.
8