Battery Power - Chauvet DJ EZLink Strip Q6 BT Guía De Referencia Rápida

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 7
Power Linking
For the maximum number of EZ Link Strip Q6 BT products that you can power link at each voltage, see the User Manual
or the sticker on the product.
Fuse Replacement
1.
Disconnect the product from power.
2.
Wedge the tip of a flat-head screwdriver into the slot of the fuse holder.
3.
Pry the safety cap out of the housing.
4.
Remove the blown fuse from the clip on the front of the safety cap and replace with a fuse of the exact same
type and rating.
5.
Re-insert the fuse holder and reconnect power.

Battery Power

The EZ Link Strip Q6 BT comes with a rechargeable lithium battery for cable free operation.
Charging the Battery
The battery charges whenever the EZ Link Strip Q6 BT is plugged into the external charger and the charger is plugged
into a power source. If the product is plugged in and not in operation, make sure the product is turned off.
When using the multi-charger, charge the EZ Link Strip Q6 BT while the unit is
powered OFF.
The LED indicator light will flash if you overpower your units.
Battery Life Indicator
The indicators on the LED Menu Display show how much battery life remains available. The drawing below provides a
key to reading the battery life indicators.
100%
Battery Run Time
Maximum Run Time (all colors on)
Up to 8 hours
EZ Link Strip Q6 BT QRG Rev. 1
QUICK REFERENCE GUIDE
75%
50%
25%
Recharge Time
7.5 hours
EN
2

Publicidad

Tabla de contenido
loading

Tabla de contenido