STEP 6: Partially attach wall frame cover (Part #6).
PASO 6: Instale parcialmente la cobertura del marco de pared (Parte #6)
6
STEP 7: With wall frame cover (Part #6) partially installed, route cables as needed.
PASO 7: Con la cobertura del marco de pared (Parte #6) instalada parcialmente, guie los cables necesarios.
P12