Descargar Imprimir esta página

Aprimatic RAIDER Instrucciones Para La Instalación página 24

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

Preparatory steps
3.3
GATE CHECK
Before starting to assemble the kit, you should make a complete check of the wing and ensure that it is in good
condition and is not faulty or damaged.
Check that the wing moves smoothly and that there is no play or friction on the hinges.
Ensure that the wings are vertical (check with a plumb line) (Fig.6) and perfectly steady at all rotation points. Ensure that
the wings perfectly aligned along their whole length when closed.
Use a dynamometer to check that the opening or closing gate force does not exceed 15 kg measured at the top
of the wing. (147 N) - Ref. EN 12604 - EN 12605.
If the opening/closing force is greater than this, repair the hinges. If the problem persists, substitute the hinges.
Ensure that the pillars give suffi cient support. Reinforce the pillars where necessary.
Carry out a full risk analysis for the system and the automatic gate as per the Machinery Directive 89/392/EC.
Fig.6
Plumb line
- 24 -

Publicidad

loading