Haier AP48KS1ERA Manual De Funcionamiento Y Manual De Instalación página 21

Ocultar thumbs Ver también para AP48KS1ERA:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

Installation Procedure
Installation inspection and test run:
Please operate unit according to this Manual.
Items to be checked during test run. Please made a " " in " "
Are there any gas leakage?
How is insulation at piping connection carried out?
Are electric wires of indoor and outdoor unit firmly inserted into terminal block?
Is electric wiring of indoor and outdoor securely fixed?
Is drainage securely carried out?
Is earth line ( grounding ) securely connected?
Is power supply voltage abided by the code?
Is there any noise?
Is control display normal?
Is cooling operation normal?
Is room temp. regulator normal?
19
Test Run

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Ap60ks1eraAp48ds1era

Tabla de contenido