Ingeteam INGEREV CITY Ground Manual De Instalacion Y Uso página 33

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installing and connecting the unit
3.
Close the back access and lock it with the key.
When the charging station is powered both sockets are lit. After briefly verifying its status, the light will switch
to green and the display will show an electric vehicle and the current time. The station is ready and awaits
identification from the user in order to begin charging.
If the station detects a fault, the lights of the corresponding socket or both (if both are at fault) turn red and
indicates the type of incident on the display "9. Operation").
ABA2020IQM01_B - Installation and Operation Manual
B
A
Ingeteam
C
33
EN
ES
FR
IT

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Ingerev city duo

Tabla de contenido