For the left (C) and right (F) piping, remove the respective pipe covering (B or G) from the lateral panel.
It is recommended to keep the pipe covering that has been removed, since it can be re-used if the
air conditioner is installed in another position.
Bend the connection pipe, which must be laid at a max. distance of 43 mm from the outside wall.
Fix the end of the connection pipe (I). (see "Execution, installation and connection of the refrigeration lines").
A Pipe-holder
B Pipe protection (left)
C Left piping
D Left rear piping
a
b
c. Piping connection is easily performed by lifting the indoor unit and introducing cladding between the same
and the wall.
Remove the cladding once connection has been completed.
d
e. Try and move the indoor unit laterally and vertically to make sure that it is attached securely.
a. Insert the drain pipe (A), making sure that it slopes downwards.
b. If necessary, connect an extension (C) to the drain pipe, isolate the joint with a protection pipe (B).
tray and taken out of the compartment, do not put anything in the tray.
A
Collection tray
B
Piping compartment
C
Electrician's tape
EN - 18
E Right rear piping
F Right piping
G Pipe protection (right)
H Indoor unit outlet
D
Connection pipe
E
Connection cable
F
Drain pipe
I
Connection pipe
L Upper hook
M Lower hook
N Cladding material