Operating Procedures; Power Connection - Julabo TW2 Manual De Operación

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

7.

Operating procedures

7.1.

Power connection

Caution:
ConnOnly connect the unit to a power socket with earthing contact
(PE – protective earth)!
The power supply plug serves as safe disconnecting device from the line
and must be always easily accessible.
Never operate equipment with damaged mains power cables.
Regularly check the mains power cable for material defects.
We disclaim all liability for damage caused by incorrect line voltages!
Cooling installation / continuo water supply
Recommendation:
For continuous water supply and counter-cooling
Order No.
Description
8 970 415
Liquid level/cooling set
8 970 416
Cooling coil
Water bath protective media
We recommend the use of the "Aqua-Stabil" protective media to
eliminate the formation of algae, bacteria, and other micro-organisms.
Order No.
Description
8 940 006
6 bottles 100 ml each
8 940 012
12 bottles 100 ml each
Check to make sure that the line voltage matches the supply
voltage specified on the identification plate.
Deviations of ±10 % are permissible.
for model TW8, TW12, TW20
Water Baths
41

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Tw8Tw12Tw20

Tabla de contenido