Assembly Instructions / Instrucciones de ensamblaje
Fig. 29
Fig. 29c
(2)
1-1/4'' Hex Head Bolts
Pernos con cabeza hexagonal
de 1-1/4''
3/8" Holes
Agujeros de 3/8"
Rock
Piedra
(1) Loc Washer per bolt
(1) Arandela de seguridad por perno
(1) Flat Washer per bolt
(1) Arandela plana por perno
Fig. 29a
Fig. 29b
Staples
Grapas
Climbing Rock Wall Assembly:
1. Secure top of Climbing Rope as shown
in (Fig. 29a).
Pre-Drill Note: To prevent wood from splitting, pre-drill
Lag Screw holes with a 1/8'' drill bit & drill to a maximum
depth of the length of the Lag Screw used.
2. Use two rope staples to secure the bottom of the climbing
rope as shown in (Fig. 29b). Tap two staples in place
approximately 1'' apart. Wrap the rope under the 2'' x
4''. Then thread the rope through both staples. Double
the rope back on itself and through the first staple. Pull
the rope tight and secure in place by pounding staples in
place as shown in (Fig. 29b).
3. Install Climbing Rocks as shown in (Fig. 29c).
Ensamblaje de la pared de rocas para escalar:
1. Asegure la parte superior de la cuerda para escalar como se
muestra en la (Fig. 29a).
Nota Pre-Ejercicio: Para evitar que la madera de la división,
antes de la perforaciónLag agujeros del tornillo con un 1/8''
broca del taladro y un máximoprofundidad de la longitud de la
Lag tornillo utilizado.
2. Use dos grapas para cuerda para asegurar la parte inferior de
la cuerda para escalar como se muestra en la (Fig. 29b).
Ubique las dos grapas con una distancia de aproximadamente
1''. Envuelva la cuerda bajo la pieza de 2'' x 4''. Luego, pase
la cuerda por las dos grapas. Lleve la cuerda hacia atrás
nuevamente y pásela por la primera grapa. Tire de la cuerda
para ajustarla y asegúrela en su lugar golpeando las grapas
como se muestra en la (Fig. 29b).
3. Instale las piedras para escalar como se muestra en la (Fig. 29c).
42
Pre-Drill
pre-taladro
Eye Strap
Correa con ojal
(2)
2'' Lag Screws
tornillos de compresión de 2''
1''