REVERSING THE HyDRAULIC CONNECTIONS
ATTENTION ! Place the electric cables on the opposite side to that of the definitive hydraulic connections. Dismount the trans-
former and terminal block and mount them on the opposite side.
Instructions for reversing the main coil from left to right on vertical fancoil units:
A. Unscrew the four Ø 3.9x9.5 screws.
B. Remove the panel, moving it in the direction of the arrow "2". Unscrew the four Ø 3.9x9.5 screws "3" supporting the coil from the left and right
shoulders.
C. Slightly incline the coil towards the arrow "4" and move it away from the left-hand shoulder in the direction of the arrow "5". Press on the lock of
the funnel "6" to release it.
D. Reverse the direction of the coil from pos.7 to pos.8.
E. Open the relative pre-punched holes in the opposite shoulder "9" . Insert "10" the coil, inclined as shown in the figure, and fit the hydraulic unions
into the new holes.
F. Turn the condensate drain to the opposite side and, if present, also the condensate drip tray. Tighten the 4 Ø 3.9x9.5 screws in the aligned
shoulder-coil bracket holes "11" in the left and right shoulders. Remove the pre-punched hole "12" and insert the funnel, making sure it clicks into
place.
G. Put back the panel "13" and tighten the four Ø 3.9x9.5 screws "14".
H. Close the open holes in the left-hand shoulder "15" with closed-cell insulating tape.
Instructions for reversing the main coil from right to left on vertical fancoil units:
to reverse the coil, follow the above instructions but starting from the right-hand shoulder and not the left-hand one.
To remove the funnel, press the
lock and rotate
EN 17