Spirax Sarco B850-W-2 Guia De Inicio Rapido página 21

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

10.22 BEM configuration parameters
The following table in conjunction with Sections 10.23 to 10.34 are the recommended order
of stages for setting up the BEM. The table lists out the required values that will need to be
entered into each stage. The table can be used as a check list and ticked off at each stages
completion. Save the configuration at each stage to minimise the risk of data loss. This Quick
Start instruction must be used with the B850 Boiler House Energy Monitor Installation and
Maintenance Instruction IM-P408-03.
10.23 Steam output
Type
Size
Max F
Steam dryness
Ref pres
Ref temp
10.24 Feedwater
(page 25)
Ref pres
Ref temp
10.25 Condensate return
Nom pres
Ref pres
Ref temp
10.26 Inputs
(page 27)
IN1 - 4 mA
IN1 - 20 mA
IN1 - Alarm
IN1 - Other
IN2 - 4 mA
IN2 - 20 mA
IN2 - Alarm
IN2 - Other
IN3 - 4 mA
IN3 - 20 mA
IN3 - Alarm
IN3 - Other
IM-P408-04 AB Issue 2
(page 24)
(page 26)
Value
V
W
X
Y
Z
Units
10.26 Inputs, continued on page 22
Tick when complete
21

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

B850-p-2

Tabla de contenido