10.31 Blowdown and TDS
10.31.1 Bottom blowdown calculation
Click on process values 'Y' then Pb the BBD valve input calculation
will then be displayed, input values required.
G
T
A
t
Click on the process values
Thresholds (T), totalisers (t), alarms (A) and graph settings (G) can be set up for the Bottom
Blowdown Calculation, for full details see B850 Boiler House Energy Monitor Installation and
Maintenance Instructions IM-P408-03.
The Quickstart Configuration is pre-configured with suitable settings.
36
IM-P408-04 AB Issue 2