Door Panel Installation - golmar V2PLUS Manual De Instalación

Ocultar thumbs Ver también para V2PLUS:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

DOOR PANEL INSTALLATION

E
mbedding box positioning
1650
The upper part of the door panel should be placed at 1,65m. height roughly The hole dimensions will
depend on the number of door panel modules
Modules
Model
W
H
D
The door panel has been designed to be placed under most of the environmental conditions However,
so as to extend its service life, it is recommended to take additional precautions (visors, covered
areas
...).
To obtain a quality image on video door entry systems, avoid direct incidence from light
sources (sun, street lights,
.
1
CE610
125
140
56
...).
Break the botton flange to pass the cables through it
panels
with more than one embedding box, break the side flanges and
attach the embedding boxes using UC junctions
1850
1450
.
Compact
2
CE615
CE620
125
125
220
257
56
56
.
3
CE630
125 mm.
374 mm.
56 mm.
.
P
reparing the cables entry
. In case of door
.
85
.

Publicidad

Tabla de contenido
loading

Tabla de contenido