14. Use the alignment indicators to find a suitable position that allows access to the
configuration board, which can be opened for easy access to the network connector
during for example troubleshooting.
15. If there is cable slack after the cables have been connected, loosen the cable glands,
remove the slack and attach the cable glands again.
16. Attach the base unit to the bracket using the screws and the washers.
17. Apply Loctite
1
Base unit
2
Seal
3
Washer (4x)
4
Alignment indicator
5
Washer (4x)
6
Screw (4x)
7
Column bracket
8
Wall bracket
Attach the Pan/Tilt Unit to the Base Unit
NO TICE
TICE
NO
NO
TICE
Use the alignment indicators to align the units. Incorrect alignment could cause damage
to components.
AXIS Q8665–LE PTZ Network Camera
®
243 threadlocker on the screws and tighten the screws (torque 4 Nm).
1
2
3
4
5
6
7
1
2
3
4
5
6
27
8