11.2 Delivery scope and transport inspection
As a rule, the humidifier is delivered with the following components:
• Air humidifier
• Remote control
• Cleaning brush
• 4 descaling pads
• 4 sponges for aromabox
• Operating Instructions
► Examine the shipment for its completeness and for any visible
damages.
► Immediately notify the carrier, the insurance and the supplier about any
incomplete shipment or damages as a result of inadequate packaging
or due to transportation.
11.3 Setup location requirements:
In order to ensure the safe and trouble-free operation of the device, the
setup location must fulfil the following prerequisites:
• The device must be set up on a firm, flat, horizontal and water-resistant
surface with sufficient load-bearing capacity for the air humidifier and
content.
• Choose the setup location in such a way that children cannot reach the
device.
• The device is not intended to be installed in a wall or a built-in
cupboard.
• Do not set up the device in a hot, wet or extremely damp environment
or near flammable material.
• The device requires an adequate flow of air in order to operate
correctly. Leave a clearance of 15 cm on all sides.
• Do not cover up any openings on the device and do not block these off.
• The electrical socket must be easily accessible so that the power lead
can be disconnected easily, in the case of an emergency.
• The installation and assembly of this device in non-stationary setup
locations (e.g. on ships) must be carried out by specialist companies /
electricians, provided they guarantee the prerequisites for the safe use
of this device.
caso AirVital Pro
Please note
34