Setting Delay-Time - SPS E Serie Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Functions
Personality
Lift Acceleration
Lift Deceleration
Minimum Up speed
Jib
Maximum Up speed
Minimum Down speed
Maximum Down speed
Tower Lift Up Speed
Tower Lift Down Speed
Upper Lift Up Speed
Upper Lift Down Speed
Swing Speed
Ground control
Upper Telescope Speed
Tower Telescope Speed
Basket Rotate Speed
Basket Level Speed
Jib Lift Speed
6.4.3.

Setting delay-time

Potentiometer no.1 [1] is for adjusting the starting-up delay-time of the JLG-system. If this time is too
short, a failure of the speed-sensor occurs in the JLG system. This delay-time also influences the time
for activating the emergency-operation. Potentiometer no.2 [2] is for adjusting the rpm for the JLG-
system (required setting: 1800 rpm).
3
1
2
Indication of the E-motor rpm is presented by two LED's [3]; the lower LED glows at low rpm (as
shown in the picture), both LED's glows at high rpm.
SPS - E-series_HL_1-2
Range
Defaults D
0.1 to 5.0 Sec
1.0
0.1 to 3.0 Sec
0.7
0 to 65 %
40
0 to 100 %
100
0 to 65 %
40
0 to 100 %
100
0 to 100 %
60
0 to 100 %
60
0 to 100 %
60
0 to 100 %
100
0 to 100 %
100
0 to 100 %
100
Defaults E
5,0
0,1
45
50
44
48
60
60
60
100
100
100
27/32

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

E800ajE860sj

Tabla de contenido