2- Hole Drilling; 4- Indoor Unit Electric Connection - FGE Farelek 112501 Manual De Instrucciones

Ocultar thumbs Ver también para Farelek 112501:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

E2- hole Drilling :
• locate the outside way of the copper pipes according to the support.
WARNING ! After the unit support fixation, be sure that the hole will be hidden.
• Drill a 65 mm diameter hole using a trepan in order to put the wires trough the wall.
E3- 3- Indoor unit Depressurization :
•The internal unit is filled with air under pressure. This air will escape when the caps are taken off. This does
not present a danger, but nonetheless a strong force is required when unscrewing the screws.
• ATTENTION ! Prendre soin de ne pas détériorer les tuyaux lors de cette opération.
E4- indoor unit electric connection :
• Unscrew on this two points the frontal panels.
112501-505-506-507-H.indd 43
(except 112495: Gaz pre load model)
• with flat key ( 22 and 17 ), Lose the nuts in or-
der to bleed the air . However, unscrew lightly the
nuts .
© FAR GROUP EUROPE
EN
B
10/02/06 8:11:11

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Farelek 112505Farelek 112506Farelek 112507Farelek 112495

Tabla de contenido