INSTaLLaTION
2.1
Receiving the product
Brava One HE
appliances are delivered in a single unit protected
by cardboard packaging.
the plastic bag found inside the packaging contains the
following:
– Installation, use and maintenance manual
– paper template for boiler installation
– certificate of warranty
– Hydrostatic test certificate
– System booklet
– Bag with expansion plugs
d
IT IS fORBIDDEN
do not leave packaging material around or near
children since it could be dangerous. dispose of it as
prescribed by legislation in force.
2.2
Dimensions and weight
H
L
62
Description
W (mm)
d (mm)
H (mm)
Weight (kg)
2.3
once the packaging has been removed, the appliance is to
be handled manually, tilting it slightly, lifting it and applying
pressure in the points indicated in the figure.
Fig. 7
d
a
2.4
the room where the appliance is to be installed must comply
with the technical Regulations and legislation in force. It must
be equipped with suitably sized ventilation openings when the
installation is a "typE B" installation.
the minimum temperature of the installation room must not
be lower than -5 °C .
m
P
Fig. 8
Brava One HE
25
Handling
IT IS fORBIDDEN
DO NOT
hold onto the appliance cladding but use the
"solid" parts such as the base and the rear structure.
DaNGER
use suitable tools and accident protection when
removing the packaging and when handling the
appliance.
Installation room
CaUTION
Remember to consider the space needed in order to
access the safety/adjustment devices and to carry out
maintenance interventions (see Fig. 10).
EN
30
400
250
700
28,5