8 Putting out of operation
8 Putting out of operation
9 Maintenance and cleaning
EN - 20
1 Wait until the shielding gas flow has subsided.
2 Close the shut-off-valve for the gas supply.
3 Switch off the power supply.
Regular and lasting maintenance and cleaning are the prerequisite of a long
life and a perfect function. In doing so, observe the following:
DANGER
Risk of injury due to unexpected start-up.
For the entire duration of maintenance, servicing, dismounting and repair
work, the following instructions must be adhered to:
• Switch off the power supply.
• Cut off the compressed air supply.
• Pull the mains plug.
DANGER
Electric shock
Dangerous voltage due to defective cables.
• Check all live cables and connections for proper installation.
• Replace any damaged, deformed or worn parts.
NOTE
• The maintenance intervals given are standard values and refer to single-
shift operation.
• Maintenance and cleaning work may only be carried out by qualified
and trained specialists.
• Check coolant hoses, seals, and connections for damage and tightness.
Replace as necessary.
• Always wear your personal protective equipment when performing
maintenance and cleaning work.
1 Remove adhering welding spatter.
2 Check all screw joints for tight fit.
BINZEL offers repair services at the factory.
WH and WHPP