During the leak holding capacity test do not use naked flames!
The manufacturer shall not be held responsible and the guarantee is void in the case of damage caused by negligence in
following the installation instructions or by improper use. The guarantee is void in the case of connections which have been
made in a way which does not meet directives in force and fire-fighting regulations.
This appliance belongs to construction type (A1), so it does not need to be connected to any flue.
The distribution network pressure must meet the following
specifications:
ALLOWED
LPG
NOT ALLOWED
ALLOWED
METHANE
H
NOT ALLOWED
If the gas distribution network pressure on the installation site does not
meet the above values, inform the gas distribution company and do not
turn the appliance on until the cause has been found and removed.
Evacuation of unburnt gases
Checking the pressure
From 20/25 to 35/45 mbar
Below 20/25 or above 35/40 mbar
From 17 to 25 mbar
Below 17 or above 25 mbar
The distribution network pressure can be taken with a U manometer
(min. definition: 0.1 mbar), which can be connected to the pressure
outlet "H" (pic.6) behind the control panel.
1.
Remove the control panel.
2.
Remove the screw and sealing washer (pic.6) from the pressure
outlet and connect the manometer.
3.
Turn the appliance on following the enclosed instructions and make
sure that the pressure is within the permitted pressure range.
4.
Disconnect the manometer and replace the screw and the sealing
washer in the pressure outlet.
5.
Reassemble the appliance.
GB / IE - 2