Siting Considerations; Setting Up The Unit - Techne CH-5 Manual Del Usuario

Tabla de contenido

Publicidad

C H - 5 C h i l l e r U S E R ' S M A N U A L

Siting Considerations

Setting up the unit

P A G E 10
The units are air cooled, air being pulled in through the front and
expelled from the rear. The ventilation grilles should never be
obstructed, therefore, as this will detract from the performance. Also
the fridge units should never be situated in an enclosed space or
near an extractor fan, this too will detract from the performance.
MINIMUM
150 mm (6")
1. Check the voltage marked on the unit's rating plate against that of
the mains supply. Connect the mains cable to a suitable plug as
in the following table. Note that the unit must be earthed to
ensure proper electrical safety.
Connections
Live
Neutral
Earth
The fused plug supplied on the mains cable for use in the UK with
the RB-5A is fitted with the following fuse to protect the cable.
Supply
240V
The fuse in the unit protects the unit and the operator.
Note that units marked 240V on the rating plate work equally well
at 220V; units marked 120V on the rating plate work equally well at
110V.
220/240V
brown
blue
white
yellow and green green
fuse fitted
5 Amp
MINIMUM
150 mm (6")
110/120V
black

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Pc-5

Tabla de contenido