2 Set up the chiller on a level surface. Use demineralised water to
fill the bath and cover the cooling coil. Demineralised water is
preferred to reduce the formation of scale. If scale should form,
use only mild de-scaling agents to remove it. DO NOT attempt to
hammer, chip or scrape the deposits from the surface of the bath
or the coil.
3 Place the PC-5 on the CH-5 and position with the studs on the
chassis of the pump unit.
4 Connect the PC-5 to the unit you wish to chill. Ensure that all
connections are secure and will withstand the pressure from the
pump.
5 Plug the in line plug on the PC-5 into the socket on the back of the
CH-5.
6 Insulate all the connection pipes to minimise condensation when
working at low temperatures.
7 Both the PC-5 and the CH-5 are now ready to run.
C H - 5 C h i l l e r U S E R ' S M A N U A L
P A G E 11