Angle Iron And Rebar Support Installation; Angle Iron And Rebar Support Mounting - Greenlee Shear 30T Manual De Instrucciones

Ocultar thumbs Ver también para Shear 30T:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation Instructions – Angle Iron
and Rebar Support
Please follow the directions below to create the mount-
ing holes for the Rear Support. If your service cart
already has holes drilled for the Rear Support please
skip to the mounting instructions.
Use the base as a template and locate the base 8.75"
from the left side of the cart (see below). Line up the left
side of the base with this line. Mark a line .25" from the
front of the cart (see below). Line up the front of the base
with the 0.25" mark.
Using a marker/pencil, trace the holes on the Support
Base. Drill the four holes using a 13/32" drill bit.
8.750"
Angle Iron and Rebar
Support Mounting
To mount the Angle Iron and Rebar Support to the cart,
first line up the Support Base with the holes on the cart
and bolt the Support Base down using four 3/8-16 by
1.25" socket head cap screws and four 3/8-16 hex nuts.
See the image below.
Using the Loctite threadlocker capsule, apply thread-
locker to each screw and tighten down to a torque
of 35 ft-lbs.
Greenlee Tools, Inc.
9.125"
0.250"
Shear 30T Shearing Station
Shear 30T Shearing Station
14
4455 Boeing Dr. • Rockford, IL 61109-2988 USA • 815-397-7070

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

30t

Tabla de contenido