salmson Nexis-VE 22 Instalación Y Instrucciones De Puesta En Marcha página 60

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

English
Faults must be remedied by qualified personnel
only!
Observe the safety instructions in section 9
Maintenance!
Relays
The converter is fitted with 2 output relays serving as
interface with the centralized control, e.g.: control box,
pump control.
SBM relay:
This relay can be configured in „Service" menu <
5.7.6.0 > in 3 operating states.
State: 1 (set by default)
„Available transfer" relay (normal operation of
this pump type).
The relay is activated when the pump is running or
in standby.
The relay is deactivated if an initial defect occurs
or if the main power supply is disconnected
(pump stops). Pump availability is signalled to the
control box.
State: 2
„Run transfer" relay.
The relay is activated when the pump is running.
State: 3
„Power on transfer" relay.
The relay is activated when the pump is connect-
ed to the network.
SSM relay:
„Failures transfer" relay.
If consecutive defects of the same type are detected
(from 1 to 6 according to significance), the pump
stops, and the relay is activated (until manual interven-
tion).
Example: 6 defects with a variable time limit within 24
hours.
State of SBM relay is „Available transfer".
60
1
2
Faults
Active
relay
SBM
Relay in
relay
Active
relay
SSM
Relay in
relay
24-hour period
3
4
5
6
SALMSON 12/2013

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Nexis-ve 36Nexis-ve 52

Tabla de contenido