Scope Of Delivery; Prepare The Site For Installation - Becker BOM 850C-II Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 81
Installation

Scope of delivery

1
1x
1x
12
16
15
2
1.
Drive head including LED module
2.
Pinion
3.
Rail (model example) drive side
4.
Carriage
5.
Toothed belt
6.
Defl ection roller
7.
Rail connector (model example)
8.
Rail (model example) door side
9.
Tensioner
10. Wall bracket
Attention: Check the supplied screws and wall plugs to make sure that they are suitable for the structural
condition on the installation site.

Prepare the site for installation

1. The maximal distance between the drive head and wall socket is 1.2 m.
2. Check the stability of the garage door. If necessary, tighten the screws and
nuts of the garage door.
3. Make sure that the garage door runs smoothly.
Warning:
- Lubricate shafts and bearings according to the door manufacturer's specifi cations.
- Check the pretension of the springs and adjust if necessary.
34
11
4x
3
14
1x
13
1x
1x
5
7
17
1x
11. Door connector attachment
12. Linking bar
13. Central support
14. Bag of screws
15. Hand transmitter
16. Ceiling mounting
17. Mains cable, 1.2 m length
18. Mounting bracket
19. Warning label
6
4
8
19
WARNUNG: Automatisches Tor - Nicht im Bewegungsbereich des
Tores aufhalten, da sich das Tor unerwartet in Bewegung setzen kann!
WARNING: Automatic door - The door may operate unexpectedly,
therefore do not allow anything/anyone to stay in the path of the door!
10
18
2x
1x
9
1x
1x

Hide quick links:

Publicidad

Tabla de contenido
loading

Productos relacionados para Becker BOM 850C-II

Tabla de contenido