Remington R300 Instrucciones De Operación página 11

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Safety precautions
6. Power fasteners are a permanently installed fixture. An
act of demolition is required for their removal. Appropriate
safety precautions must be taken.
Shank
plastic Flute
7. nEVEr use common nails or other materials as fasten-
ers. Remington
special steel and heat treated to produce a very hard, yet
ductile, fastener.
8. nEVEr pry a power load out of the chamber. Prying can
discharge the load causing serious injury (see Trouble-
shooting Guide on pages 19 and 0).
LOAD
1
9. aLWaYS insert the power fastener first, then the power
load. If work is interrupted for any reason, aLWaYS remove
the power load before removing the power fastener (see
page 15, item 8).
119586
Head
Power Fasteners are manufactured from
®
2
S
F
11
UNLOAD
2
1
S
F

Publicidad

Tabla de contenido
loading

Tabla de contenido