WARNINGS
Read this manual prior to use the device in order to ensure a safe and proper use.
Preserve this manual as future reference.
The installation and maintanance of the device must be carried out by qualified technical staff, adequately trained by ISEO.
The instructions should be carefully followed during installation. These instructions and any maintenance instructions should be passed on by the installer
to the user.
No modifications of any kind are permitted, except for those described in these instructions.
The product must be destined only for the use for which it is expressly designed and therefore as web server controller for civil and industrial locations.
Any other use is considered improper and dangerous.
The electrical connection must be made according to the constructor's instructions and respecting the regulations in force.
For all repairs, exclusively contact a technical assistance center authorized by the constructor.
Disconnect the power supply before carrying out any technical service that involves opening or accessing the internal parts of the product.
Dispose of the product separately from household waste, in accordance with local laws and regulations.
The calculation of the cables section must be per formed by qualified staff.
Max cable length of LOCKBUS channel is 100 mt (sum of all branches).
Recommended voltage for LOCKBUS channel is 24 VDC.
In case of power failure the rechargeable battery inside the Atlas ensure power for 30 minutes max.
Ensure full recharge of the Atlas internal battery by running a full recharge cycle (24 hours), minimun every 6 months.
It is advisable to provide for an appropriate sectioning, a protection switch upstream of the transformer.
Atlas earth connection is mandatory.
Add Surge Protection Devices (SPD) to the mains, upstream the Atlas Master, when connected to Atlas Slaves, Actuators and Readers placed in outside
areas of the builing (not equipotential zones), according to the Lightning Protection Risk Assessment of your building and current legislations.
For any technical assistance or repairs, contact only Iseo Serrature or an Iseo Zero1 authorised technical centre.
Iseo Zero1 reserves the right, without prior notice, to make all the necessary modifications to the product and to the instruction manual, for quality
improvements or manufacturing or marketing needs.
2. ATLAS INSTALLATION
Move the jumper on
Battery ON
Battery
ON
Connect the CAT5e/CAT6
Ethernet cable coming from
the
Switch PoE (cable and
switch PoE not included)
Lift up and remove
the white cover
BATT
ON
Battery
ON
MADE IN ITALY
PoE
Console
ETH
To PoE Switch
(IEEE 802.3af
up to 15,4W)
DO NOT REMOVE!
(Wire connected between
+V OUT and +Power IN)
For future
developments
ATLAS DIN PoE
R
CH0
CH1
CH2
AUX
TX/RX
TX/RX
TX/RX
Lockbus
channel
RS485
channels
https://www.iseo.com/it/en/download
Connect to 192.168.0.184 from Google Chrome,
Microsoft Edge or Apple Safari Internet browser.
Check the green
Power IN LED is ON
ON
OFF
LED reference table
Ref.
Color
ON
Green
OFF
Red
Power IN
12 VDC - 800 mA
BATT
Orange
24 VDC - 400 mA
Relay
Relay
1
2
ETH
Orange
TX/RX
Orange
Orange
TX/RX
Orange
TX/RX
Onboard
Relays
Description
Power IN active
Switch OFF
Backup battery
pack operating
Ethernet activity
Serial Tx/Rx CH0
Serial Tx/Rx CH1
Serial Tx/Rx CH1