OPERATIONAL CHECKS
After repairs are completed and air lines are reconnected, start the
engine, build-up pressure to 100 psi and shut off the engine. Check
for air leaks at the inlet and outlet of the dryer. Correct any leakage
problem. Restart the engine and build-up pressure to cut-out pressure.
At cut-out pressure the dryer purge valve opens and immediately expels
a large volume of air, followed by a slow flow of air lasting approximately
thirty seconds. Check for leakage at these locations to insure the Pure
Air Plus Air Dryer operates properly.
A. Compressor unloader mechanism.
B. Governor.
C. Drain cock and safety valve in first (supply) reservoir.
D. All air connections leading to and from the first (supply)
reservoir.
Haldex Brake Products Corp.
North American Sales Division
10707 N.W. Airworld Drive
Kansas City, MO 64153-1215
Phone: (816) 891-2470
8/01 500 ART L31139
Haldex Limited
North American Sales Division
525 Southgate Drive, Unit 1
Guelph, Ontario
CANADA N1G 3W6
Phone: (519) 826-7723 - Fax: (519) 826-9497
Installation Instructions
Pure Air Plus
TM
Turbo-Saver
Repair Kit
(DQ6031)
L31139
8/01