Troubleshooting - Saeco SIMPLA LAVAZZA AMODO MIO Instrucciones Para El Uso

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 28
Problem Encountered
The machine does not switch on.
ndicator light is off after having
The i
pressed the main switch and waited for
some minutes.
The machine needs a lot of time to
warm up.
The pump is very noisy.
The loading lever does not reach the
brewing position.
Coff ee is cold.
Coff ee is brewed too fast, the brewed
coff ee is not creamy.
Coff ee is not brewed and some steam
comes out from the pod compartment.
Coff ee is not brewed or brewed in drips
only.
After use, the pods have holes only on
the upper fi lm.
Please contact a Saeco service centre for any faults not covered in the above table or when the suggested solutions do not solve the problem.
TECHNICAL SPECIFICATIONS
Nominal Voltage - Power Rating - Power Supply:
See label on the appliance
Dimensions:
Height
Width
305 mm
235 mm
Weight: approx. 5 kg
Water tank: approx. 1 litre - Removable type
Materials used for the housing: Thermoplastic material
Power cord length 1.2 m

TROUBLESHOOTING

Possible Causes
»
The machine is not connected to the electric
network.
»
The appliance is full of limescale.
»
No water in the tank.
»
The tank has been fi lled without priming the
water circuit.
»
Used pod drawer full.
»
Pod inserted incorrectly.
»
The indicator light was off when the
coff ee brew switch was pressed.
»
Pod already used.
»
The loading lever was not set to the brewing
position.
»
Clogged dispensing spout.
»
The water circuit is empty.
»
The water circuit is empty.
Depth
330 mm
Solution
»
Connect the machine to the electric network.
»
Contact the authorized service centre.
»
Descale the appliance.
»
Refi ll with fresh drinking water.
»
Prime the water circuit (see Section "Circuit Priming").
»
Empty out the used pod drawer.
»
Repeat the sequence, lever in the off position, lever in the
brewing position; if that is not enough, intervene manu-
ally to remove the pod from the duct after unplugging
the machine.
»
Wait until the indicator light turns on.
»
Place the lever back in the off position and insert a new
pod.
»
Set the loading lever to the brewing position.
»
Carry out the dispensing spout wash cycle (see MAINTE-
NANCE AND CLEANING).
»
Prime the water circuit (see Section "Circuit Priming").
»
Prime the water circuit (see Section "Circuit Priming").
Control panel: On the upper part
Boiler: Stainless steel
Safety devices: Boiler pressure safety valve
Thermal fuse.
2006/42 EC - 2004/108 EC - 2006/95 EC
EN

Publicidad

Tabla de contenido
loading

Tabla de contenido