Pressure vessel
Pressure tested at: 4-25 litre:
40-50 litre:
Directions for use
Application
Receiver for compressed air.
Receiver specifications See name plate.
Installation
Tubes, etc. must be installed with
suitable materials.
Placement
Observe the working temperature
of the receiver.
Ensure sufficient room for
inspection and maintenance.
The receiver must be kept in a
horizontal position.
Corrosion protection
The surface treatment must be
maintained as required.
Internal inspection at least every
5 years.
Drain condensate at least once a week.
Alternation/repair
No welding must be made on
pressurised parts.
Safety valve
Ensures that PS will not be exceeded.
Never adjust to a higher pressure
than PS.
The capacity of the valve must be
calculated in accordance with the
volume of air supplied by the
compressor.
(PS = Maximum working pressure
of the receiver)
Declaration of Conformity
NOTE: The declaration of conformity is only valid for units
operating at 20 V/50 Hz, x400 V/50 Hz, 12 V DC or 24 V DC.
The manufacturer, JUN-AIR International A/S, declares that the
products mentioned in this manual are in conformity with:
•
87/404/EEC - 90/488/EEC - 9/68/EEC Council Directive
relating to Simple Pressure Vessels
•
98/7/EC Machinery Directive
•
89/6/EEC EMC Directive
•
7/2/EEC Low Voltage Directive
Flemming Petersen
Quality Manager
24 bar
18.3 bar
Operating manual
GB
9