Pre-‐Operating
I nstructions:
G enerator
S etup
CAUTION:
A ny
a ttempt
t o
s tart
t he
g enerator
b efore
i t
h as
b een
p roperly
s erviced
m ay
result
i n
e ngine
f ailure
a nd
v oid
w arranty.
CHECK
A IR
C LEANER
E LEMENT:
1. Remove
t he
M aintenance
A ccess
C over.
( Refer
t o
C ontrols
a nd
F eatures
s ection).
2. Remove
t he
A ir
C leaner
C ase.
3. Pull
o ut
t he
A ir
C leaner
C artridge,
f ollowing
t he
d irection
o f
t he
a rrow.
4. Check
t he
c leanliness
o f
t he
A ir
C leaner
E lement.
5. Clean/Replace
i f
n eeded.
6. Reinstall
t he
A ir
C leaner
E lement.
7. Reinstall
t he
A ir
C leaner
C ase.
8. Reinstall
t he
M aintenance
A ccess
C over.
R efer
t o
d iagram
b elow.
16
LIFAN
P ower
U SA
2205
I ndustrial
P ark
R oad
Van
B uren,
A R
7 2956
866-‐471-‐7464
www.lifanpowerusa.com