Loading the trailer without Safe-Quick® 2 Guardrail
A
EN
B
The image above shows the maximum load (rolling tower width 14.20 m working height). Ensure that the trailer is loaded as
symmetrically as possible when transporting configurations with fewer parts for optimal road grip.
On both sides of the trailer, place 1 guardrail frame first. Then secure the equipment with a lashing strap.
1.
C
D
20
www.altrex.com
1
2.
6.
1
5.
4.
3.
1.
2.
3.
4.
5.
6.
For 2 platforms, use the lower space.
For 4 platforms, use the upper space.
For 6 platforms, use all the spaces.
2
Assembly frames
Guardrail frames
Platforms
Braces
Triangle stabilisers
Toe boards
2