• Use short tubing lengths to supply the vacuum from the distribution
manifold to the individual instrument. Use a distribution valve and a
barb fitting of the correct dimension at each instrument location.
• Keep the number of junctions, elbows and the tubing length from the
vacuum source to the instruments to a minimum to keep the vacuum
loss in a system to a minimum.
Mechanical installation
Instrument mounting
Install the instrument on a level surface or on a wall with one of these
mounting kits:
• DIN rail kit (supplied with the instrument)—use to quickly remove the
instrument from the wall.
• Wall mounting bracket (optional)—use for permanent installation.
Refer to the instructions supplied with the kit.
Refer to the illustrated steps in
remove the instrument from the rail, lift the bottom of the instrument.
Figure 5
for DIN rail installation. To
Figure 5 DIN rail installation
English 9