FE-Series Heating Cable Installation Instructions
MODULO DI REGISTRAZIONE PER ISPEZIONE PERIODICA
Circuiti di protezione al gelo-
Effettuare questi controlli in base agli approcci usati richiesti dalla stagione.
Circuiti di manutenzione delle temperatura-
Eseguire queste verifiche al meno 2 volte l'anno.
Controlli di manutenzione per ________________ Mese _____________ Anno _____________
Ispezione visiva all'interno della scatola di connessione
corrosione, umidità, ecc.
Danni o crepe (perdite) dei sigilli di isolamento a valvole, supporti,
pompe, ecc.
cavo scaldante correttamente collegato e messo a terra. cavo
scaldante e connessioni isolati dalla scatola di connessione.
Termostato deve essere controllato per l'umidità, corrosione, set
point, switch operation, and capillary damage
Megger tests performed at power connection with both bus wires
disconnected from power wiring.
Tensione del circuito a connessione di alimentazione
Circuito amperaggio dopo 5 minuti
Temperatura del tubo è stata misurata in Amp di tempo.
Watt/piedi
Volts x Amps = w/piedi
piedi
Tutte le connessioni, scatole e termostati sono stati risigillati.
Sigilli di estremità, giunzioni coperte e giunti a tee contrassegnati
Sul rivestimento isolante.
Osservazioni e Commenti
© BriskHeat Corporation. All rights reserved.
Numero circuito
Tipo del riscaldatore
Lunghezza del circuito
Iniziale
Data
Iniziale
Data
Iniziale
Data
Punto
diriferimeno
Iniziale
Data
Lettura
Iniziale
Data
Lettura
Lettura
Lettura
Iniziale
Data
Iniziale
Data
Iniziale
Data
72
FE-Series Heating Cable Installation Instructions

LEAD TERMINATION PREPARATION

STEP 1:
Determine the module length of the heating cable.
Module points can be identified by slight
indentations on the rounded surface of the outer
jacket. You can determine the module point by
touch or visually by sliding back the metallic
overbraid.
STEP 2:
Cut the cable between the module points for the
desired length of cold lead. The length of "cold
lead" must be at least 12 in (305 mm) but no longer
than the module length minus 6 in (152 mm). The
section of cable between the end of the cable and
the first module point will be the cold lead. This
section will be used for lead termination / power
input connection.
STEP 3A:
Push 6 in (152 mm) of the metallic overbraid
back to expose the extruded jacket on the cable.
Using a pair of Wire Cutters, cut off 4 in (101
mm) of the exposed cable.
© BriskHeat Corporation. All rights reserved.
STEP 4:
Pull the metallic braid back over the end of the
cable. Push the cable through the side of the
metallic braid. Twist the empty braid to form a
pigtail lead and crimp a ring terminal on the end
(see picture above). A crimp barrel can also be
used to extend the ground (braid) to another 12
AWG ground wire.
STEP 5:
Slide the metallic overbraid back at least an
additional 6 in (152 mm) to further expose the
cable jacket. Using a knife, carefully cut and
remove 6 in (152 mm) of the extruded jacket to
expose the spirally wrapped resistance wire and
the two bus wires. Do NOT damage the bus wires
or the bus wire insulation; the resistance wire must
NOT come into contact with the exposed bus
wires. Unwrap and cut the resistance wire back to
the point you cut the cable jacket.
STEP 6:
Slide a lead pouch over the two bus wires and
over the extruded jacket. Push the metallic braid
up to the lead pouch. Slide a shrink tube over the
lead pouch and the metallic braid. Using a heat
gun or other appropriate heating device, apply
heat evenly over the entire surface of the tube,
shrinking it over the metallic braid and lead pouch.
Using wire strippers, remove 0.75 in (19 mm) of
the insulation from the bus wires to expose the
conductors.