Drill The Power Supply Cord Hole; Cut The Opening Required For The Duct; Install Mounting Plate - Whirlpool MMV5100AAW Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

OTR-Installation-M1.fm Page 12 Wednesday, September 27, 2000 4:03 PM

DRILL THE POWER SUPPLY CORD HOLE

• Cut or drill a 2" diameter hole at the area marked M for the power supply
cord hole on the upper cabinet template.
NOTE: If the upper cabinet is metal, you will need to cover the edge of the
hole with the power supply cord bushing to prevent damage to the cord
from the rough metal edge.
WARNING: cover the edge of the power supply cord hole in a metal cabinet
with the power supply cord bushing. Failure to do so could result in
damage to the cord and may cause electric shock.

CUT THE OPENING REQUIRED FOR THE DUCT

• Room Venting: Remove the upper cabinet and wall templates and go to
next step, INSTALL MOUNTING PLATE.
• Roof Venting: Cut out the shaded area marked L on the upper cabinet
template with keyhole saw. Remove the upper cabinet and wall templates.
Go to next step, INSTALL MOUNTING PLATE.
• Wall Venting: Cut out the shaded area marked O on the Wall template with
keyhole saw. Remove the upper cabinet and wall templates. Insert wall vent
through vent opening. Use caulking to seal wall opening around exhaust
cap. Go to next step, INSTALL MOUNTING PLATE.

INSTALL MOUNTING PLATE

• Remove any adhesive tape from door. Take out all the items from inside the
oven. Put adhesive tape back on the door.
1
• Insert
x 3" toggle bolts through holes in mounting plate that match the
/
"
4
3
location of the
/
"
4
of each toggle bolt. Leave enough space for the toggle to open when
pushed through the wall.
1
/
" x 3"
4
toggle bolt
• Position mounting plate on the wall. Push toggle bolts and nuts through the
holes in the drywall.
1
NOTE: Insert 4,
/
4
stud. Make sure that top of mounting plate is on the same level as the front
edge of cabinet bottom or cabinet frame, securely tighten wood screws and
toggle bolts.
When tightening toggle bolts, make sure toggle heads have opened against
drywall by leaving at least one wall thickness of space between the head of
the toggle bolt and the spring toggle head.
1
/
" x 3" toggle
4
bolt head
Mounting Plate
holes in the drywall. Start a spring toggle nut on the end
Mounting
Plate
x 2" wood screws into
"
         
Wall
12
Spring toggle head
3
holes drilled into wooden wall
/
"
16
Spring toggle head

Publicidad

Tabla de contenido
loading

Tabla de contenido