Pcb Height Adjustment; Led Setting (Dip 1) - Paradox Magellan MG-PMD85 Guia De Instalacion

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

PCB Height Adjustment

The MG-PMD85 is designed for optimal
performance at a height of 2.1m (7ft), but can be
installed lower or higher. After you have installed
the detector, ensure that the adjustable height
markings on the upper right of the PCB's cover
inside the unit match the installation height.
For example, if the detector is installed at a
height of 2.1m (7ft), the PCB should then be
adjusted to 2.1m (7ft). Align the desired marking
(height) with the back cover's plastic tab (Figure
1 on page 26 and Figure 2 on page 27).
If another installation height is called for, readjust
the PCB accordingly. Any PCB adjustments
should be followed by a walk-test of the
protected area. Walk-testing verifies that the
required coverage is in place.
Ensure that the unit's front and back cover
are tightly joined together without any
spacing (around the rim of the unit) before
tightening the screw, otherwise the
weatherproof casing may be compromised
and moisture may enter the unit.

LED Setting (DIP 1)

This option enables or disables the red LED. The
red LED will illuminate for a period of four
seconds to indicate detected movement. The
motion detector performs a battery test every 12
2
http://www.bakonline.net/
Magellan MG-PMD85

Publicidad

Tabla de contenido
loading

Tabla de contenido