3. INSTALLATION
3.1. DIMENSIONS (mm)
3.2. INSTALLATION REQUIREMENTS
The control box should be installed in all cases with the gland at the bo-
ttom. Any other position will compromise the IP envelope. Cable glands
that are not used must be tightened clockwise until opening is closed.
3.3. ELECTRICAL SUPPLY
Supply (J3):
Class:
230V input/output (J9):
+24Vdc output (J10):
14
230V 50Hz
II
3A
200mA