The JetNet 6810G only supports single power input that binds V1 and V2 together to obtain
higher current for the booster.
Use the UL listed Switching power supply to power the JetNet Switch. For the power wiring
method, please refer to the figures 3.1-1 and 3.1-2. For system safety and the anti-immunity
ability, the chassis ground screw should be well grounded to the earth ground.
Note:
E.G: Earth
Grounding
Figure 3.1-1. Power Supply wiring architecture
Figure 3.1-2 Power connector assembly diagram
3.2 RS-232 console and Relay Output Connection
The RS-232 console and the alarm relay are
connected via the assembly type of 5-pole M12
A-coding connector included in the supplied
package of JetNet switch. The following figure
3-2-1 is the disassembly diagram of M12
A-coding connector.
In the M12 connector packing, the parts 1, 2, 3
are already assembled.
Follow the steps for soldering and assembling
the cable and connector together:
M12 disassembly connector
Figure 3.2-1 Field Assemble