Required Every 12 Months; Maintenance Procedures - Parker BAS-2010 Manual Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

Preventative Maintenance Kits

Required every 12 months

4.2 Maintenance Procedures

The following maintenance procedures should only be performed by competent, trained, qualified personnel and
approved by Parker domnick hunter.
Ensure that the unit is fully depressurised before carrying out any of the following maintenance procedures.
Maintenance Procedure 1
Access to the filter train can be made from the underside of the BAS-2010 unit.
8
Description
BAS-PMK10-12
Contents
010AA
010AC (x4)
Seals
Auto drain

Publicidad

Tabla de contenido
loading

Tabla de contenido