Maintenance Chart - Ehrle HDB Serie Manual Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

PROCEDURE
Check engine oil level
Change engine oil*****
Check water pump oil level
Change water pump oil **
Oil leak inspection
Fuel leak inspection
Water leak inspection
Hose inspection
Water inlet filter inspection
Check fuel filter
Replace fuel filter
Inspect belts (HDB only)
Replace high pressure nozzle***
Inspect fuel pump filter*
Replace fuel nozzle*
Check burner air adjustment
Check burner electrodes*
Test water pressure*
Test fuel pressure*
Test water temperature*
Descale coil****
*
Must be performed by an authorized service technician.
**
The pump oil must be changed after the first 50 hours of operation and every 250 hours or 3 months,
whichever comes first.
***
High pressure nozzle should be replaced whenever pressure is less than 85%.
****
Scale buildup will vary with mineral content in the water and amount of usage. Descaling can range from
weekly to yearly maintenance.
*****
The engine oil must be changed after the first 8 hours of operation and every 50 hours or 3 months, which
ever comes first.
HDB/HDD-SERIES Operator's Manual

MAINTENANCE CHART

DAILY
3 MONTHS
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
6 MONTHS
9 MONTHS
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
2 MONTHS
X
X
X
X
X
X
X
X
X
X
X
X
X
X
29

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Hdd serie

Tabla de contenido