ENGLISH
NEW BATTERY, STARTUP SEQUENCE
1. Each time you put in a new set of batteries, the
indicator will go through a startup sequence. See
"Battery Installation and Replacement" on pages 25,
26. At the end of the sequence you will need to move
the spindle to initialize the measurement system.
2. When the indicator comes on after the batteries
have been changed, the display will go through a
series of changes Fig.1-5.
Note: The information displayed here will change
depending on the indicator you are using and is
shown, to give you an idea of what to expect when
changing the battery.
Full Lamp
Version
10
PKG08803-UM2900
Fig. 1
Fig. 3
Calibrate the Indicator
Catalog Number
Firmware Version
Fig. 5
Fig. 2
Fig. 4