Descargar Imprimir esta página

ShelterLogic Shed-in-a-Box 70333 Instrucciones De Montaje página 6

Ocultar thumbs Ver también para Shed-in-a-Box 70333:

Publicidad

Idiomas disponibles

Idiomas disponibles

5. SqUArInG UP tHe FrAMe
A. Place frame in its final location, which needs to be as flat and level as possible.
B. Measure across opposite corners. These distances must be equal to within 1".
C. Check that the front and rear of the frame measures 10' in width
6. ProPerlY AncHor tHe FrAMe
A. Anchors must be placed inside shelter at the corners of the shelter.
B. Insert a ¾" pipe or steel rod, through the eyelet of the auger and screw the anchor into the ground until the
eyelet is sticking out of the ground by 1-2" so it can be anchored to the legs.
If ground is too hard, dig a hole with a shovel or post hole tool. Optional: Fill with cement.
C. Wrap cable provided through the eyelet of the anchor and around the frame as shown below. Secure
the cable with the clamps provided.
10'
Page 6
10'
End Rib Anchors
NOTE:
15" Augers are for temporary use only!
We recommend 30" Augers be used,
4 minimum for use in a permanent installation.
WARNING:
Serious injury to persons or property could result if
cover is installed and shelter is not anchored and is
left unattended. Shelter must be securely anchored.
05-70333-70733-70833-0G

Publicidad

loading

Este manual también es adecuado para:

Shed-in-a-box 70833Shed-in-a-box 70733