1.
Important initial information for the technician
About this manual
Dear reader,
These instructions supplement the installation instructions for the BioWIN 2 Touch with the 200 kg pellet hopper. It
contains only the instructions for installing the hopper. Please also refer to the installation instructions for the
BioWIN 2 Touch itself.
1.
Important initial information for the technician
1.1 Safety precautions
The boiler/heater and related accessories are state of the art and meet all applicable safety regulations. Your boiler/
heater and all accessories operate using 110–120 V AC electric current. Improper installation or repair can pose a
threat of life-threatening electric shock. Installation should be performed only by appropriately qualified technicians.
The original manual is written in German – this is an English translation. In case of conflicts, the German version is
always valid.
1.1.1 Caution symbols
Please take note of the following safety information levels in this manual.
DANGER
WARNING
CAUTION
Note!
The blocks of text identified by this symbol provide information and tips for operation.
1.1.2 General safety information
DANGER
1.2 Align boiler
Move the boiler into position and use the 4 set screws to align it horizontally
or inclined slightly upwards towards the rear. To align the boiler, place the
spirit level on top of the door frame or seal steel sheet at the front – Fig. 2.
Tip!
If the clearance too the wall is not very big on the right, adjust
the back right set screw previously.
Ignoring the warnings identified by this symbol can lead to serious injuries or death.
Ignoring the warnings identi ed by this symbol can lead to injury.
Ignoring the warnings identified by this symbol can lead to malfunction of or damage
to the boiler or heating system.
Also read and observe the safety information in the operating manual.
Fig. 2
14
EN
Aligning the boiler with a spirit level