Warranty And Support; Technical Support; Introducción - Leviton P1000 Series Manual De Instalación

Tabla de contenido

Publicidad

Warranty and Support

Warranty
See www.leviton.com for details.

Technical Support

Leviton understands that there are often questions when installing and/or using
a new product. Free Technical Support is provided from 6:30 AM to 4:30 PM,
Monday-Friday, Pacific Time. Please call 1-800-824-3005.
Leviton Critical Care/Life Support Policy
Leviton does not recommend the use of any of these products in any of the
following situations:
Life support applications in which a malfunction or failure of the Leviton
product can be reasonably expected to cause failure of the life support
device, or significantly affect its safety or effectiveness.
Direct patient care.
It is against Leviton policy to sell its products for use in such applications unless it
receives in writing assurances satisfactory to Leviton that:
The risks of injury or damage have been minimized.
The customer assumes all such risks.
The liability of Leviton Manufacturing Co., Inc. is adequately protected under
all circumstances.
The term "life-support device" includes but is not limited to anesthesia ventilators,
arrhythmia detectors and alarms, auto-transfusion devices, blood pumps,
defibrillators, hemodialysis systems, infusion pumps, neonatal oxygen analyzers,
neonatal ventilator incubators, nerve stimulators (whether used for anesthesia,
pain relief, or other purposes), pacemakers, peritoneal dialysis systems,
ventilators (for adults or infants), and any other device designated as "critical" by
the U.S. Food and Drug Administration.
Please Recycle
Shipping materials are recyclable. Please save them for later use, or
dispose of them appropriately.
PK-93384-10-02-0F
10
© 2009 Leviton Manufacturing Co., Inc. All Rights Reserved.
Introducción
Guía de inicio rápido
Las siguientes instrucciones le ayudarán a instalar rápidamente el Bastidor de
la Unidad de Distribución de Energía (PDU) serie P100 de Leviton para usarlo
en su gabinete o bastidor. Para información detallada de cada paso, vaya a la
página numerada de la lista de abajo.
1. Montaje del PDU en el gabinete o bastidor
2. Conexión del PDU a la fuente de energía
3. Conexión de los productos al PDU
Revisión de los equipos
El cordón de entrada de energía
conecta el PDU con la fuente de
alimentación eléctrica. Todos los
indicadores LED, interruptores de
circuito y puntos conexión a tierra
están etiquetados claramente para
identificación fácil.
LED de energía
LED de Polaridad/Tierra o Tierra está bien
LED de protección
Interruptor de circuito (Estilo cuchilla)
Interruptor de circuito (2 Polos, Estilo botón)
Interruptor de circuito (Capacidad - UL489,
Estilo palanca)
Punto de conexión a tierra
Cordón de entrada de energía
© 2009 Leviton Manufacturing Co., Inc. Todos los derechos reservados.
Página 25
Página 27
Página 27
PK-93384-10-02-0F
23

Publicidad

Tabla de contenido
loading

Productos relacionados para Leviton P1000 Series

Tabla de contenido