Assembly - Pinnacle International MASTER MH-80V-LPC-B Manual De Usuario E Instrucciones De Funcionamiento

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

11 mm Screws (6)
Missing Parts? Please Call 800-641-6996 For Assistance
Attaching The Upper Housing
1. Slide Upper Housing straight up and off of
lower housing and remove all packed items
from inside the heater. (See Figure 4)
2. Remove all packaging protecting the heater
during shipping. Retain caps for covering the
inlet connector and regulator hose fro storage.
3. Inspect heater closely for any damage that
may have occurred during shipping. If there is
any damage, return the heater to the place of
purchase.
Figure 4
© 2015, Pinnacle Products International, Inc.
NEVER LEAVE HEATER UNATTENDED WHILE BURNING,
CONNECTED TO A POWER SOURCE, OR WHILE
CONNECTED TO A FUEL SOURCE
Assembly Instructions
What's In The Box
Regulator (1)
4. Attach three (3) screws to the bottom row of
5. Slide upper housing over lower housing,
NOTE: Save carton and packaging material
for later storage.
Figure 5
5
holes in the lower housing. (See Figure 5)
lining up the four remaining screw holes.
Insert three (3) screws and tighten securely.
(See Figure 5)
Convection Heater User's Manual
Upper Housing (1)

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Master mh-200v-lpc-b

Tabla de contenido