Thermor ALLURE Manual De Instalación Y De Uso página 17

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

2) Connecting the device
- The device must be supplied with 230V, 50Hz.
- Mains connection must be ensured using the 3-wire cable factory fitte to the heater , through a
connecting box. In damp premises, such as bathrooms and kitchens, install the connecting box at least
25cm from the ground..
- The installation must comply with local national regulation. If in doubt, ask the national Atlantic dis-
tributor.
- Ground connection is forbidden.
Do not connect the pilot wire (black) to ground.
- If power cable is damaged or too short, to avoid any danger it must be replaced by a qualified elec-
trician using special tools.
- If a heater pilots or is piloted by a 30mA differential (e.g. bathroom), the pilot wire supply must be pro-
tected on this differential.
3) Programming
The device can be controlled remotely if its pilot wire is connected to a device fitted with a program-
mer, a programming unit or an energy management unit.
Chart indicating the orders the device can receive over its pilot wire
Orders received Current absent
Ref/neutral os-
cilloscope
Mode achieved
Panel heater cable
Live=brown
Neutral=blue
Pilot wire=Black
Two possible cases
1st case: only one heater
2nd case: multiple heaters
(to be measured between the pilot wire and the neutral).
Full wave 230V
COMFORT
ECO
LIVE
Electricity
grid
NEUTRAL
The pilot wire end is insulated
and not further connected
The pilot wire of all heaters in a
control group, up to a maximum
of 20 units with any one them used
as the Master, are connected
2
by a 1.0mm
220-240V insulated cable
Negative half
wave -115V
STANDBY
15
Positive half wave
+115V
STOP HEATING
LOAD SHEDDING
GB

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Allure elect041108Allure

Tabla de contenido