Installation Example; Accessories Construction; Accessories Installation - Aqua TECHNOPOOL TT Manual De Instalacion Y Uso

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

b: The power cable without the plug is connected to the junction box "m" (must be 230v) which
supplies power to the pool circulation pump "n". Thus, when the power to the circulation pump is
interrupted, the Technopool will stop dosing until power is restored.
c: connector Hirschmann male input to be connected to the connector Hirschmann female of the
probe "i"
d: Suction hose of the pump connected to the foot filter "f " into the tank of chemical "p"
e: Delivery hose of the pump connected to the injection nipple "g" of probe holder
g: Injection valve integrated inside the probe holder, delivery tube "e" is also inserted here
h: Collar connected to the injection valve "g" before the input of the recycle of the swimming pool.
i: temperature probe into the injection probe holder "j" , to be positioned in vertical position with a
tolerance of ± 45°
j: Injection probe-holder for temperature probe "i" and product injection coming from Technopool
"e", It must be place after all the devices.
m: Junction box to supply power to the filtration plant (already in your pool plant)
n: Circulation pump to suck the water from the swimming pool and send it into the filter "o" (already
in your pool plant)
o: Filter for the filtration of the water of the swimming pool (already in your pool plant)
p: Tank of chemical to feed the peristaltic pump through the foot filter "f".
q: Swimming pool injection

2.6 Installation example

X = 1,5 meters, recommended distance between pump and product tank, to avoid corrosive
vapour reaching the pump.
Y = 1,5 meters, maximum height to ensure the correct pump flow rate

2.7 Accessories Installation

Probe holder assembly
- The injection probe holder (j) can be installed on a DN50 or DN60 PVC tube, after a 24mm hole
has been drilled
- Ensure the injection tube is inserted so that it points in the direction of flow marked by the arrow
o
- The injection probe holder must be installed within ± 45
of the vertical.
How to make D24mm hole
- Drill a 5 mm pilot hole in the top of the PVC tube
- Enlarge the hole with the special tool D24mm supplied in the kit
- Remove any burrs from the hole
ADSP7000596 TECHNOPOOL TT FRA-ING-ITA-SPA-POR Rev1.2
15
28/06/2013

Publicidad

Tabla de contenido
loading

Tabla de contenido